Production efficiency

Injection Molding Production Efficiency Consulting

Excessive cycle times, recurring mold problems, scrap and downtime quietly reduce profitability. Bob Gray helps you find those losses and improve performance with your existing molds, equipment and people.

Automated molding line running a multi-cavity tool
Production
Sound familiar?

What we hear before the first call

  • Our cycle times have crept up and nobody can say why.
  • The same mold problem keeps coming back, no matter how many times we tear the tool down.
  • Scrap is eating the margin on jobs that should be profitable.
  • A mold is always down for repair when we need it most.
  • The process drifts from shift to shift.
  • One area of the plant cannot keep up, and everything waits on it.
Send a message instead
What it covers
Cycle time

The actual cycle broken down by stage on the press, so you can see where the seconds go and which ones can be safely recovered.

Scrap

Recurring defects traced back to their cause in the tool, the process or the material, instead of being adjusted around.

Mold downtime

Why a tool keeps coming out of the press, and what in its design, condition or maintenance has to change.

Process stability

A process that holds from shift to shift, with each change verified before it becomes the standard.

Production bottlenecks

How material, molds and people move through the plant, and the one step that is limiting everything else.

Bob's approach

How the work is done

  1. Start with the numbers

    A free 15-minute call, then a look at your cycle times, scrap, downtime and process data to see where the losses are.

  2. Watch it run

    On the floor or from process data, Bob looks at the whole cycle and the tool, not just the setup sheet.

  3. Find the cause, not the symptom

    When process changes keep failing, the investigation moves to the tool, the maintenance practice or the flow through the plant.

  4. Rank the fixes by payback

    Every opportunity is ranked by expected payback before any change is made, so you can make a clear business case.

  5. Verify every change

    Each change is checked against dimensions and cosmetics before it is adopted.

What you get
  • A cycle breakdown by stage, measured on the press
  • Root-cause findings for recurring defects and mold downtime
  • A ranked list of opportunities with the expected payback of each
  • Recommended changes to the tool, the process and the maintenance practice
  • A written summary and a follow-up call with your team

You work directly with Bob

45+ years of hands-on injection molding experience, and no stake in which mold builder you choose.

Cycle-time savings calculator

What are a few seconds worth?

Enter your current cycle and the cycle you think the tool can run. The calculator shows what that adds over a year.

Capacity now1,920,000parts a year
Improved capacity2,133,333parts a year
Added capacity+213,333parts a year

Theoretical capacity. Assumes the same run hours, full use of the added capacity and unchanged yield. Actual savings depend on demand, utilization, scrap, labor and material.

Case studies

From Bob's own programs

Plumbing (PEX connectors)Recurring mold defect

A two-year underfill problem traced to one hidden part

Bob's role
Tooling Manager, family-owned injection molder in rural Iowa
Result
With the obstruction removed, all 8 cavities ran at full capacity. Two years of recurring tear-downs ended.
Read the case
Automotive (Cadillac)Warpage

The flat part that took a week to solve

Bob's role
Engineer at an automotive OEM
Result
The part molded flat and scrap stopped.
Read the case
Clear covers (instant tickets)Mold maintenance

Recurring marks on a clear part, solved at the source

Bob's role
Tooling Manager, family-owned injection molder in rural Iowa
Result
The recurring marks and daily re-polishing stopped.
Read the case
In more detail

The services behind this page

Production

Improving Cycle Times

Working with your team to fine-tune the entire molding process, from cooling to ejection to robot handoff.

Learn more
Production

Reducing Molding Cycle Times and Costs

Cycle time drives efficiency and profit. Every second saved is multiplied across every part you run.

Learn more
Production

Reviewing the Process Flow at Your Facility

An on-site look at how material, molds and people move through your plant, to cut downtime and bottlenecks.

Learn more
FAQ

Questions Bob is asked

Not answered here? Send Bob a message.

How much cycle time can be saved?

It depends on the tool and process. Bob identifies the opportunities and ranks them by expected payback before any changes are made.

Will changes affect part quality?

Every change is checked against dimensions and cosmetics before it is adopted.

Do you need access to our plant?

Not always. Many opportunities can be found from process data, with an on-site visit when it adds value.

Which areas do you travel to?

Bob is based in Campbellsville, KY, and travels to manufacturers across the United States.

Can you help justify tooling changes?

Yes. Each tooling recommendation includes the expected payback so you can make a clear business case.

Free 15-minute call

Losing time or parts on a tool that is already running?

Tell Bob what the tool is doing. You'll get a straight answer on where to look first.